MINIMUM IGNITION ENERGY

Code: 25013-00

COMPLIANCE :

ASTM E2019 ; IEC-61241-2-3; EN-13821

APPLICATION :

To determine the exact and precise energy and concentration at which a dust cloud is combustible or will ignite.

We are also available on Whatsapp between 11 am to 6 pm

FEATURES

a. Energy Range : 1mJ to 2000mJ

b. Dispersion pressure : 7Bar (0.7mpa)

c. Automatic setting of required Voltage, Current and time

d. Colour Touch screen user interface

e. LAN Enabled system

f. Automatic Pre-run to determine the exact energy delivered

g. Digital Display of all parameters on the touch screen controller

h. Auto-detection of ignition by means of a thermal sensor

i. Recording of all parameters like Required Energy, Actual Dissipated energy, air Pressure, Voltage, Current, sample weight, Concentration ambient temperature, humidity and Result

j. Can be operated as a stand alone or via PC

k. Integrated into a fume cupboard for easy connection to your ventilation

l. Can be interfaced to a balance to record sample weight  (OPTIONAL)

m. 100% GLP compliant with password protection at every level and data + event log of all parameters and functions.

n. Remote diagnostic and support (OPTIONAL)

 o. Quick connection/setup design for fast and easy operation.

p. Can be programmed to auto run with preset energy raise and can also instruct the user to place a certain amount of sample for ignition, hence controlling the concentration. Saving costly skilled manpower. (Available only with balance option)

q. Provision to calibrate all parameters and sensors connected to the system.

r. Test vessel made of Borosilicate Glass.


OPTIONAL ACCESSORIES/SPARES

Balance with communication cable

*                    Remote diagnostic capability and function

*                   Calibration of all parameters and sensors

* 25013-       Spare Pressure sensor

* 25013-       Spare Solonoid Valve

* 25013-       Spare Electrode Holder

* 25013-       Spare Electrodes

*                    Vacuum Oven

*                    Test sieve


PRE-INSTALLATION ON-SITE REQUISITES

Ventilation system to connect to the fume hood

Power : 15A, 3 pin power supply

Clean dry and regulated air supply Min. 8 Bar.